System YOM is 2007. System is de installed in September 2024 and ready for shipping. Tube Dura 422-MV YOM2014, slice time 809ksec. Installed options:
GetWorklist, CAP 3D filter SSD, CAP 3D filter MIP, CAP3D Main, CAP 3D VOIMODE, Bolus Track, Care Dose, Syngo General License, CAP 3D Filter VRT, CAP3D Editor, MPPS Support, RTD, Emotion 16.
For additional pictures and system details - please contact us.